One of the first steps we needed to perform was to have a percolation test done on our acreage to see whether we could install an underground septic system or had to use an above-ground lagoon. Mike Rezac took the initiative to contact Lloyd Jakoubek at Raymond Contracting to get that test done. It takes a couple weeks, so it's good to have that out of the way. The results just came in, and we failed the test, meaning we have to go with either an engineered type system or a lagoon.
Discussions on building a new custom home as well as remodeling or fixing an old one.
Monday, July 21, 2014
Monday, July 7, 2014
Checking home builder references
In the three weeks since I last wrote, our three potential custom home builders have been compiling detailed bids on the plans we had drawn up. While we wait for them to do their thing, we've been contacting the references that each of them gave us. Overall, the results are pretty close for the three. Here's what we've learned.
Subscribe to:
Posts (Atom)